Aluminum curtain wall unique texture, rich color, durable, and the appearance
of the shape can be diversified, and with the glass curtain wall materials,
stone curtain wall material perfect combination. But want to have a good effect,
in the construction of aluminum curtain wall installation should pay attention
to several issues.Stainless steel plate
prices
Construction should be checked before the installation of the location of the
embedded parts are complete, the location is in line with design requirements.
Permissible deviation of embedded parts: elevation deviation ± 10mm; axis about
± 30mm.
If the embedded parts are missing or the position deviation is too large,
the remedial action should be taken when tilting. Curtain wall embedded parts
and connectors should be anti-corrosion treatment, contact with different metal
materials should be set at the insulation cushion or take other anti-corrosion
measures for processing. Beam and column installation: measuring line - column
installation - beam installation.Stainless
steel coils price
Composite aluminum plate after forming, the whole piece of aluminum through
the surrounding aluminum angle (or aluminum angle iron) and keel connection,
with screws fixed on the keel, easy to install, but pay attention to the
installation of precision control. Specific considerations have the
following:
(1) to check the connection, measurement, adjustment.2b surface 304 stainless
steel plate supplier
(2) fixed fire insulation material should be anchor firmly, fire insulation
layer should be smooth, splicing should not leave the gap.
(3) condensate drain pipe and accessories should be connected with the
horizontal components reserved hole tightly connected with the lining plate
outlet hole should be set at the rubber seal.
(4) other ventilation slots and rainwater discharge, etc. should be designed
and constructed, shall not be omitted.2017 stainless steel price